On June 30, 2010 a severe hail storm hit the Bozeman area.  The church sustained damage to the siding and to the colored glass windows above the entry door.  We replaced all the siding on the west and south sides and removed the windows and replaced them with “Hardi Panel” siding over insulation and sheetrocked the inside.  These repairs should help conserve energy as well as improve it’s appearance. 

.